|
Reasons for Keeping
P.V. Park
News
Park History
Park Location
Parking Lot
Maps: Trail
| Other
Using P.V. Park
Hiking | Dog
Walking
Cross Country Skiing
Mt. Bike Riding
Bird / Nature Watching
Fields, Flowers, Woods
Peace and Quiet
Conservation Classroom
Hunting | Geocaching
P.V. Park Volunteers
National Public Lands Day
Photo Gallery
Spring
Summer
Fall
Winter
Aerial Photos
Biodiversity
Species List-Flora
Species List-Fauna
Observation Reports
Other Conservation
and Recreation Web Sites
|
|
Trail Work Day on May 9, 2007 |
| The evening trail work on 5/11
was a big success! We had 11 hard working volunteers and 4 or 5
wheelbarrows, so we were able to place the fabric, stone, and limestone
dust on over 100 feet of trail in one evening. The entire wet area
is now covered with a "rail trail" like surface and includes
a culvert pipe to drain a ditch that crosses the trail. The trail
here should never be muddy again. We also have some stone left over,
and plan to treat a few other much smaller wet areas on the trail
in the future. Thanks to J.A. Rutter Co (www.jarutter.com)
for donating the stone and limestone dust, to James Lasitis - Lasitis
& Son Supply of Harrison City for the pipe, and a big thanks
to all that helped.
In addition, three of us spent about 3 hours Sat 5/12 working on
the new trail. Thanks Lou and Jereme. We then did a mountain bike
ride of the trail afterward. The weather was perfect.
|
|